Bay Builders

2 days 15 hours ago

A look at the project the day after the pour, showcasing the completed slab and continued progress on site.

Bay Builders

3 days 15 hours ago

Project update

A big milestone on site, with 148m³ of concrete poured to complete the slab.

The Bay Builders team and Northland Concrete Pumping were on site from 4:30am, getting the pour underway early and keeping the project moving.

A huge effort from both teams and another major step forward for the project.

Bay Builders

1 week 15 hours ago

Pods are in place and the team is ready to begin tying the steel.

We’re getting close to slab pour, with all the preparation coming together on site.

Not long now!

Bay Builders

1 week 4 days ago

Cladding is now underway on site, marking another stage in the external works.

Despite challenging weather conditions, the team is continuing to maintain progress and keep the build moving. With two projects being worked on simultaneously, the team is managing multiple sites while keeping both builds on track.

Another solid step forward as the exterior comes together.

Bay Builders

2 weeks 15 hours ago

There’s been plenty happening behind the scenes on site.

The plumbers have been through, the slab has been filled, and we’re now almost ready to tie the reinforcing steel and prepare everything for the concrete pour.

A lot of the work at this stage happens before you see much above ground, but it’s all part of getting the foundations right for the build ahead.

Bay Builders

2 weeks 4 days ago

A great outlook from one of our current renovation projects.

This full-house renovation involves a complete rework of the existing layout, with the design being tailored to suit our clients’ needs and make the most of the home and its surroundings.

A couple of glimpses from site as the renovation continues to progress.

Bay Builders

3 weeks 11 hours ago

The Waipapa shed project is nearing completion, with the final stages of construction now underway.

With three shed projects currently progressing, the team is keeping busy across multiple sites. Each project is moving forward to schedule, with quality workmanship and attention to detail remaining the focus through to completion.

Bay Builders

3 weeks 4 days ago

Another key milestone reached on site with the roof now installed.

The building envelope is starting to come together, giving a much clearer view of the finished structure. With roofing complete, the project can now progress into the next stage of the build.

Good progress on site as the team continues to push ahead.

Bay Builders

4 weeks 10 hours ago

A home is more than its structure — it’s the details that make it unique.

Throughout this build, the clients have made a number of considered design choices that will create standout features throughout the home. As construction progresses, those selections are starting to take shape and add another level of detail to the finished design.

It’s great to see their vision coming together on site.

Bay Builders

1 month 2 days ago

Concrete placement is underway, with the blockwork being filled to strengthen and reinforce the structure.

Firth are supplying the concrete, with Northland Concrete Pumping on site for the pour.

The team continue to make excellent progress on site, even with the wet conditions.